Our work — recent installations
Photos from actual jobs, taken on the day we finished them. No stock images, no borrowed galleries.
Recent EV charger installs
Eight recent charge point installations across South Ruislip, Chalfont, West Drayton, Ruislip, Beaconsfield, Pinner and Harefield. Tap any photo to see it full size.
-
Hypervolt charge point — South Ruislip
Tethered Hypervolt unit on rendered wall beneath the bay window, with the lead coiled around the charger and the connector docked in a holster alongside. Cable run neatly down the wall to the driveway.
EV charger -
Ohme charge point — Ruislip
Tethered Ohme unit on brick, with the lead coiled around the charger and the connector docked in a holster above. Supply cable run neatly along the wall from the connection point.
EV charger -
Ohme charge point — Chalfont
Tethered Ohme unit on a pebbledash rendered wall, with a separate holster above so the plug stows off the ground and the lead coils neatly around the charger.
EV charger -
Ohme charge point — West Drayton
Tethered Ohme unit on a pebbledash front elevation near Stockley Park, sited between the window and the door with a holster above so the lead coils on the charger and stays off the ground.
EV charger -
Hypervolt charge point — Ruislip
Tethered Hypervolt unit on brick, with the lead coiled on the charger and a separate holster round the corner so the plug stows off the ground.
EV charger -
myenergi zappi GLO — Beaconsfield
Tethered charge point on a painted brick elevation, sited clear of the gate swing and the pipework below, with the lead coiled on the unit.
EV charger -
Ohme charge point — Pinner
Tethered Ohme unit on a rendered wall, with a separate holster above so the lead stows off the ground, clear of the downpipe and the walkway.
EV charger -
Easee charge point — Harefield
Untethered Easee unit on red brick, with the supply cable clipped in line with the mortar course so the run sits square to the brickwork.
EV charger
How we leave a job
Every install above was carried out to BS 7671 (18th Edition), tested, certified and notified. Cable runs are clipped square, penetrations are sealed, and the unit is set where it actually suits the car and the house — not just where it was quickest to fit.
Work is covered by a 12-month workmanship guarantee, and you get your certificate before we leave.
Want yours to look like this?
Send three photos — the meter position, the fuse board, and where you'd like the charger — plus the make of your car. You'll get a straight price back.